Automated Deformation Monitoring Survey
Automated Deformation Monitoring Survey checks on ground and/or existing buildings stability. Such surveys are typically carried out over a period of time at regular intervals on specific points at the same structure or same ground area. This system can be deployed in the construction of tunnels, buildings, viaduct and any surface areas which require deformation monitoring.
Measurement cycles are automatically programmed at pre-agreed, customisable cycles. When the monitored movements exceeded a pre-defined trigger threshold, the Client will be alerted via SMS notification. Once the system is set in place, it does not require human intervention and it allows for 24/7 continuous, all-weather monitoring further complemented by intermittent manual checks to ensure results integrity. The monitoring system enables engineers and architects to react to potential issues before they arise.
Automated Deformation Monitoring Survey was carried out in the live MRT tunnels while the 168,100m2 mixed development and regional hub, Paya Lebar Quarter (PLQ) was being constructed. The systems were installed during the entire construction period to safeguard existing structures and to determine if the tunnels have experienced displacement.
Automated Deformation Monitoring Survey checks on ground and/or existing buildings stability. Such surveys are typically carried out over a period of time at regular intervals on specific points at the same structure or same ground area. This system can be deployed in the construction of tunnels, buildings, viaduct and any surface areas which require deformation monitoring.
Measurement cycles are automatically programmed at pre-agreed, customisable cycles. When the monitored movements exceeded a pre-defined trigger threshold, the Client will be alerted via SMS notification. Once the system is set in place, it does not require human intervention and it allows for 24/7 continuous, all-weather monitoring further complemented by intermittent manual checks to ensure results integrity. The monitoring system enables engineers and architects to react to potential issues before they arise.
Automated Deformation Monitoring Survey was carried out in the live MRT tunnels while the 168,100m2 mixed development and regional hub, Paya Lebar Quarter (PLQ) was being constructed. The systems were installed during the entire construction period to safeguard existing structures and to determine if the tunnels have experienced displacement.